Erecting a platform for welding and repair works on the overlaps
between the tile carrier and mixing chamber is quite
a messy job considering the shape of the mixing chamber
which is shape like a snail.
Now with the jig we can have more room to
move about instead of a bundle is pipes everywhere.
The sketch before the job starts.
This is the jig or holder where the the scalfolding works starts.
2 set will be needed since we have 2 combustor.
A closer look at the holder.
A ladder and platform is ready for work to start.
No comments:
Post a Comment