The 50ies were the days when Connaught Bridge Power Station
in Klang was the largest power station in Malaya,
first commissioned in January 1953
and formally opened by the High Commissioner,General Sir Gerald Templer on 26 March 1953.
It had a total generating capacity of 80MW of power
from 4 X 20MW Steam Turbine(Parsons)
The old plant was fully utilised until it was decommissioned in 1984
ending a colorful era of the CEB Connaught Bridge as the locals fondly call it.
video clip of the opening ceremony in 1953
High Commissioner's,Selangor Regent's and Menteri Besar's autographs.
Scorpions rocking it out at Connaught Bridge Power Station.
Some old photos from my collection of dredging works
by the Klang River
at the cooling water pump(CWP)house intake
of the Connaught Bridge Power Station
back in 1974 when the old steam station
was still running.
Seen in the background were the old Connaught Bridge, a bailey bridge
and old KTM's Truss railway bridge
which were replaced by concrete ones in the 90ies.
The barge somewhere in Port Klang probably to load the crane in.
Erecting a platform for welding and repair works on the overlaps
between the tile carrier and mixing chamber is quite
a messy job considering the shape of the mixing chamber
which is shape like a snail.
Now with the jig we can have more room to
move about instead of a bundle is pipes everywhere.
The sketch before the job starts.
This is the jig or holder where the the scalfolding works starts.
2 set will be needed since we have 2 combustor.